# Chelmsford Business installs new Dexion Racking

## Chelmsford Business installs new Dexion Racking

## Chelmsford Business installs new Dexion Racking

## Sector:

## Date Fitted:

## Location:

## Brand:

## Manufacturing

## December 2024

## Chelmsford, Essex

## Dexion P90+

**Project Overview: Temporary Warehouse Solution in Chelmsford, Essex**

In August, Dexion Anglia Ltd. visited a client site in Chelmsford, Essex, to assess their needs and collaborate with the management team on creating an efficient temporary warehouse solution. Our goal was to design a space that met both their operational and budgetary requirements.

**Tailored Solution & Design**

After meeting with the team and understanding their needs, we drafted a detailed CAD layout and provided a comprehensive quotation. The proposal included:

- **2 Single Runs** and **10 Double Runs** of Galvanised [Dexion P90+](https://www.dexion-anglia.co.uk/product/dexion-p90/) adjustable pallet racking
- [Open-boarded timber decking](https://www.dexion-anglia.co.uk/product/decking/)
- [Push-on guards](https://www.dexion-anglia.co.uk/product/rack-protection/) and[safety end barriers](https://www.dexion-anglia.co.uk/product/barriers/) for added protection

The solution was designed to align with the client’s lead times and budget, and by late October, we were thrilled to be awarded the project.

**Installation & Customization**

Once the temporary warehouse structure was in place, we conducted a thorough site survey to ensure the racking system was optimized for the space. Based on the survey, we fine-tuned the layout, and the final design was approved by the client in November.

**Efficient Delivery & Setup**

In mid-December, our team sprang into action, delivering and installing the racking system over four efficient days—just in time for the client’s new product to arrive in January. The project was completed with the necessary [SEMA load notices](https://www.dexion-anglia.co.uk/product/safety-load-notices/) to ensure compliance and safety.

**Ongoing Support**

To ensure everything remains in top shape, we’ve scheduled an [annual rack inspection](https://www.dexion-anglia.co.uk/projects/rack-inspection/) for the following year, reinforcing our commitment to long-term partnership and support.

## Project Photos

 [View Project Photos](#photos)

---
Source: https://www.dexion-anglia.co.uk/chelmsford-business-installs-new-dexion-racking/