title: "Dexion APR Project In Newcastle: 3-week Install Case Study 2026"
description: "See how Dexion Anglia delivered a Newcastle APR racking install in 3 weeks, from site survey and CAD plan to 2,800 pallet locations and safety fit-out."
url: https://www.dexion-anglia.co.uk/dexion-apr-project-in-newcastle/
site: "Dexion Anglia Ltd - Warehouse Racking Solutions"
published: 2012-11-29
modified: 2023-07-04
language: en-GB
---

# Dexion APR Project in Newcastle

## Dexion APR Project in Newcastle

## Dexion APR Project in Newcastle

## Sector:

## Date Fitted:

## Location:

## Brand:

## Transport Logistics 

## April 2012

## Newcastle upon Tyne

## Dexion Silverline P90 Pallet Racking

 

**Dexion Anglia** have just completed another exciting project which was designed and Installed within 3weeks.
Our sales team headed to site to measure up, which was then drawn up on a CAD Drawing to show the customer the best possible solutions in getting the most amount of pallet locations.
The project was then Installed by our SEMA engineers and generated 2,800 pallets locations. Finally the projects was closed by adding, Upright guards,  tubular barriers & load notices.