---
title: "Dexion P90+ Pallet Racking Project In Ipswich, 2019 Phase 1"
description: "See how a Dexion P90+ galvanised pallet racking install in Ipswich delivered 100% pallet access, with CAD in 7 days and installation in 4 weeks."
url: https://www.dexion-anglia.co.uk/dexion-p90-project-in-ipswich/
site: "Dexion Anglia Ltd - Warehouse Racking Solutions"
published: 2019-08-28
modified: 2021-01-28
language: en-GB
---

# Dexion P90+ Project in Ipswich

## Dexion P90+ Project in Ipswich

## Dexion P90+ Project in Ipswich

## Sector:

## Date Fitted:

## Location:

## Brand:

## **Project: Dexion P90+ Adjustable Pallet Racking.(Phase One)**

#### *Date: November 2019*

#### *Location: Ipswich,  Suffolk*

#### *Sector: Transport Logistics *

 

Here we have completed of a Dexion P90+ APR Project for a new customer who required a storage facility fully galvanised, with 100% accessibility to every pallet, we attended site, measured and provided a CAD drawing with 7 days, to which we then delivered, install and compete the project in a further 4 weeks. 

- Total number of bays: 195
- Total Pallet Locations: 1,170

Have a similar project? please contact us on 01553 666010. More details on Dexion P90 racking system can be found [Here](https://www.dexion-anglia.co.uk/product/dexion-p90/).

 ![Warehouse interior with tall racking holding pallets and cardboard boxes along wide central aisle](https://www.dexion-anglia.co.uk/wp-content/uploads/2020/04/racking-shelving.jpg)

## Project Photos

 [View Project Photos](#photos)

---
Source: https://www.dexion-anglia.co.uk/dexion-p90-project-in-ipswich/
