# Mezzanine Floor in North Norfolk

## Mezzanine Floor in North Norfolk

## Mezzanine Floor in North Norfolk

## Sector:

## Date Fitted:

## Location:

## Brand:

## Construction

## March 2021

## Watton,  Norfolk

## Mezzanine Floor

We were asked to attend site and measure, advise and quote for a new mezzanine floor in Norfolk, upon a couple of revised tweaks to the original specification we gladly received the order. This was processed directly with the factory to whom carried out a detailed site survey and produced a CAD drawing for sign off. This then went to manufacture and was delivery & installed with 6-8 weeks. The project consisted handrail, edge protection including kick board, Staircase with double landing and pallet gate for receiving pallets and goods. Fire rating was completed by the customer.

Have a similar project for Mezzanine floors across the East Anglia, Essex and beyond – please contact us.