# SEMA Engineers install Dexion racking for customer in Peterborough

## SEMA Engineers install Dexion racking for customer in Peterborough

## SEMA Engineers install Dexion racking for customer in Peterborough

## Sector:

## Date Fitted:

## Location:

## Brand:

## Manufacturing

## August 2025

## Peterborough

## Dexion P90

#### **Project Overview**

Dexion Anglia Ltd was approached to carry out a comprehensive site survey for the customers new **chiller and finished goods store**. The objective was to design and install a racking solution that maximised storage capacity while maintaining the highest standards of safety and compliance.

#### **Our Solution**

Following the initial survey, our team produced two layout proposals to optimise the available space. The customer selected the [Dexion P90 racking system](https://www.dexion-anglia.co.uk/product/dexion-p90/), renowned for its strength, durability, and reliability in demanding warehouse environments.

During a final pre-installation site inspection, we identified minor but critical challenges: additional cooling units had reduced available space, and a new fire door had been installed. Collaborating closely with the client, we **repositioned a bay** to maintain total pallet capacity and engineered a **bridge bay over the fire door**, ensuring both safety and operational efficiency.

#### **Project Delivery**

The project was delivered directly from our **King’s Lynn warehouse**, with our **SEIRS-trained in-house team** completing the installation over three days. All works were carried out to full **SEMA standards** and included:

- [Mesh decking](https://www.dexion-anglia.co.uk/product/decking/)
- [Anti-collapse mesh](https://www.dexion-anglia.co.uk/product/anti-collapse-mesh/)
- [Rack Armour guards](https://www.dexion-anglia.co.uk/product/rack-protection/)
- [End barriers](https://www.dexion-anglia.co.uk/product/barriers/)
- [SEMA safe working load signage](https://www.dexion-anglia.co.uk/product/safety-load-notices/)

#### **Ongoing Support**

Finally the customer has engaged Dexion Anglia Ltd to provide [annual SEMA racking inspections](https://www.dexion-anglia.co.uk/projects/rack-inspection/) and [rack awareness training](https://www.dexion-anglia.co.uk/projects/rack-awareness-training/) for six employees, ensuring continued compliance and operational safety across their storage facilities.

## Project Photos