sales@dexion-anglia.co.uk

Dexion Sign Off Form

Dexion Anglia - Racking Handover Sign off

Dexion Anglia - Racking Handover Sign off form provided to the customer.

Please fill out prior to leaving site

We confirm that the project has been installed inline with current SEMA guidelines. The team supervisor must check prior to the handover of the project: That there is no visable damage to any item or component That the rack / floor / partitioning is level. That all baseplates are secured down to the floor slab with the correct fixings. That the racking / shelving / floor system / partitioning has been built inline with all design information supplied That the racking / shelving / partitioning / floor system has been installed inline with SEIRS and SEMA / British Standards guidelines
Engineers Name(Required)
Contact Name(Required)
MM slash DD slash YYYY

For Engineers

Have all beam levels and clips been checked?(Required)
Confirm SEMA Load notices have been installed?(Required)
Has the plant been checked and off-hired?(Required)
Site has been left clean & tidy?(Required)
Drop files here or
Accepted file types: jpg, jpeg, png, gif, pdf, Max. file size: 20 MB.

    For Client

    Were the Engineers polite & ontime?
    Did the Engineers wear the correct PPE?
    Has the equipment been installed to your satisfaction?
    Did the Engineers leave the site clean & tidy?
    Please enter a number from 0 to 10.
    0 - Worst 10 - Amazing
    Clear Signature