01553 666010
sales@dexion-anglia.co.uk
£
0.00
0
Basket
Home
Products
Pallet Racking
Mezzanine Floors
Cantilever Racking
Lockers
Steel Partitioning
Vertical Racking
Shelving
Office Shelving & Furniture
Accessories
Store
Services
Pallet Rack Inspections
Pallet Racking Repair
Racking Installation & Relocation
Rack Awareness Training Courses
Site Survey & Racking Quotation
Racking Identification
Rack Inspections
Info
About us
Office Catalogue
Meet The Team
Join Our Team
Case Studies
FAQ
Contact Us
Home
Products
Pallet Racking
Mezzanine Floors
Cantilever Racking
Lockers
Steel Partitioning
Vertical Racking
Shelving
Office Shelving & Furniture
Accessories
Store
Services
Pallet Rack Inspections
Pallet Racking Repair
Racking Installation & Relocation
Rack Awareness Training Courses
Site Survey & Racking Quotation
Racking Identification
Rack Inspections
Info
About us
Office Catalogue
Meet The Team
Join Our Team
Case Studies
FAQ
Contact Us
get a quote
Dexion Sign Off Form
Dexion Anglia - Racking Handover Sign off
Dexion Anglia - Racking Handover Sign off form provided to the customer.
Please fill out prior to leaving site
We confirm that the project has been installed inline with current SEMA guidelines. The team supervisor must check prior to the handover of the project: That there is no visable damage to any item or component That the rack / floor / partitioning is level. That all baseplates are secured down to the floor slab with the correct fixings. That the racking / shelving / floor system / partitioning has been built inline with all design information supplied That the racking / shelving / partitioning / floor system has been installed inline with SEIRS and SEMA / British Standards guidelines
Engineers Name
(Required)
Lee Bishop
Darryl Stevenson
Company
(Required)
Contact Name
(Required)
Contact Name
Customer Email
(Required)
Date
MM slash DD slash YYYY
For Engineers
Have all beam levels and clips been checked?
(Required)
Yes
No
Confirm SEMA Load notices have been installed?
(Required)
Yes
No
Has the plant been checked and off-hired?
(Required)
Yes
No
Site has been left clean & tidy?
(Required)
Yes
No
Upload Images
Drop files here or
Select files
Accepted file types: jpg, jpeg, png, gif, pdf, Max. file size: 20 MB.
For Client
Were the Engineers polite & ontime?
Very Satisfied
Average
Not Satisfied
Did the Engineers wear the correct PPE?
Yes
Sometimes - needed reminding
No
Has the equipment been installed to your satisfaction?
Very Satisfied - Great job!
Average
Not Satisfied - Needs attention!
Did the Engineers leave the site clean & tidy?
Very Satisfied - Great job!
Average
Not Satisfied - Great job!
Rate us!
Please enter a number from
0
to
10
.
0 - Worst 10 - Amazing
Signature
(Required)