Dexion Anglia Ltd were contacted by a local business who had just completed building two adjacent units. They asked us to look at putting a mezzanine floor in each.
The design of the two units were slightly different, and therefore needed a different approach to both floors. Once we had discussed the specific details with the client, we were able to design two floors, with different heights and staircase location to maximise the space needed. The client also required pallet gates to both floors.
The second floor also had to be slightly higher due to the client needing to store their van overnight. The designs were drawn up, and after a few minor adjustments, they were approved, and the project was able to move forward. We were able to supply and build the floors within the required timeframe and they were completed just in time for Christmas.
The customer was very pleased with the outcome and has since enquired about adding shelving above and below the floors.